Installation Advice
1. 20-40mm depth of sharp sand or grit is screeded and leveled over a sub-base
2. Compact the sand/grit using a plate vibrator
3. Loosen the top surface with a rake before starting to lay the paving
4. Start laying at a fixed edge restraint to required pattern
5. Ensure you use 3-4 packs simultaneously to avoid colour banding
6. Dried sand or grit is then brushed over the paving to fill the joints
7. The pave vibrator is then passed over the paved area again